open pit iron ore mining india mechanical process optimization ppt

Easy profit maximization method for openpit mining

Easy profit maximization method for openpit mining

The profit function can also be formulated in unit values (per ton or cubic meter of ore), by assigning a unit profit function L ′ (/h), which is given by (2) L ′ = T U V − M − E R − B − F P. In all these variables, there are two geological characteristics, which have great importance: the stripping ratio R and the grade of ore is therefore essential to determine what their ...

A Robust Optimization Modeling for Mine Supply Chain Planning ... Hindawi

A Robust Optimization Modeling for Mine Supply Chain Planning ... Hindawi

The mine supply chain usually contains three stages, which is mining, processing, and ore product transportation. This paper tackles the difficulty of variable cutoff grade by establishing a robust optimization model. To solve the robust optimization model, the nonlinear constraints in the model were linearized first.

PDF The Application of Stochastic Mine Production Scheduling in the ...

PDF The Application of Stochastic Mine Production Scheduling in the ...

a case study that focuses on the longterm production planning of an openpit iron ore mine in India. The stochastic production scheduling was performed. For stochastic modelling, only the geological uncertainty or risk was considered; however, any other uncertainty can be incorporated with the additional computational burden.

PDF Phases of A Mining Project Elaw

PDF Phases of A Mining Project Elaw

Openpit mining Openpit mining is a type of strip mining in which the ore deposit extends very deep in the ground, necessitating the removal of layer upon layer of overburden and ore. In many cases, logging of trees and clearcutting or burning of vegetation above the ore deposit may precede removal of the overburden. The

(PDF) Open Pit Mining ResearchGate

(PDF) Open Pit Mining ResearchGate

Open pit mining method is one of the surface mining methods that has a traditional coneshaped excavation and is usually employed to exploit a nearsurface, nonselective and lowgrade zones...

Process effluents and mine tailings: sources, effects and ... Springer

Process effluents and mine tailings: sources, effects and ... Springer

Increasing population levels, growing economies, rapid urbanization and changes in consumption patterns have increased the demand for raw materials such as base and precious metals, leading to growing concerns regarding their availability and the global efficiency of the mine supply chain. Mine tailings, consisting of process effluents that are generated in a mineral processing plant, are ...

PDF Surface Mining Methods and Equipment EOLSS

PDF Surface Mining Methods and Equipment EOLSS

effective for smallscale operations. Most bauxite, iron, and copper ore is mined by open pit techniques, lead and zinc ore are principally extracted by underground mining methods, and precious metals, particularly gold and most notably in the USA and Australia, tend to be recovered in recent years from lowgrade deposits by surface mining.

IOP Conference Series: Materials Science and Engineering PAPER OPEN ...

IOP Conference Series: Materials Science and Engineering PAPER OPEN ...

mining engineering, and economics [1]. Mineral mining is a fairly complex process technique and can last for decades [2]. There are two kind of mining methods widely used, namely open pit mining and underground mining. One of the challenges faced by open pit mining industry is determining the optimal cutoff grade of the mine to be processed. The

Mathematical Optimization Models and Methods for OpenPit Mining DiVA

Mathematical Optimization Models and Methods for OpenPit Mining DiVA

Amankwah, H. (2011). Mathematical Optimization Models and Methods for OpenPit Mining. Doctoral dissertation. ISBN . ISSN . Openpit mining is an operation in which blocks from the ground are dug to extract the ore contained in them, and in this process a deeper and deeper pit is formed until the mining operation ends.

Open pit mining | PPT SlideShare

Open pit mining | PPT SlideShare

Science Open pit mining is the process of mining a near surface deposit by means of a surface pit excavated using one or more horizontal benches. The term open pit mining is usually used for metallic or nonmetallic deposits and sparingly used for bedded deposits like coal. Prof. Professor at University of Mysore Follow

Application of Optimisation Techniques in Open Pit Mining

Application of Optimisation Techniques in Open Pit Mining

The operation and management of a large open pit mine having a life of several (550) years is an enormous and complex task. Optimisation techniques can be successfully applied to resolve a number of important problems that arise in the planning and management of a mine.

PPT Open Pit Mining PowerPoint Presentation, free download ID:

PPT Open Pit Mining PowerPoint Presentation, free download ID:

Presentation Transcript. Explanation: Openpit mining, also known as opencut mining, and strip mining, refers to a method of extracting rock or minerals from the earth by their removal from an open pit. Most of the time, when the mining company is done with it, the pit is used as a landfill. A landfill is used as a dump to get rid of our garbage.

Efficient simulation for an openpit mine ScienceDirect

Efficient simulation for an openpit mine ScienceDirect

An openpit mine bulk materials handling system case study is presented to demonstrate the approach. A dispatching heuristic controlling the operation of the trucking system can be optimised through the selection of values for four control parameters. ... some background knowledge of the process of openpit mining is necessary. The purpose of ...

Phase Planning for Open Pit Coal Mines through Nested Pit ... Hindawi

Phase Planning for Open Pit Coal Mines through Nested Pit ... Hindawi

Figure 4 is a 3D view of the four phasepits of the optimized phase plan, where phase4 pit is also the best ultimate pit. Figure 5 is a vertical cross section of the phasepits superimposed on the coal seams in the column model. The direction of phase expansion can be clearly seen from these figures. One can also see the rationality of the optimization results from the spatial relationship ...

Optimising Productivity and Safety of the Open Pit Loading and ... MDPI

Optimising Productivity and Safety of the Open Pit Loading and ... MDPI

The open pit mining load and haul system has been a mainstay of the mining industry for many years. While machines have increased in size and scale and automation has become an important development, there have been few innovations to the actual load and haul process itself in recent times. This research highlights some of the potential productivity and safety benefits that the incorporation ...

A globalscale data set of mining areas | Scientific Data Nature

A globalscale data set of mining areas | Scientific Data Nature

The first example (Fig. 3a) shows the main open cut of the Carajás iron ore mine complex in the Brazilian Amazon, which is among the world's largest iron ore mining operations 43. Figure 3b ...

(PDF) Performance Measurement of Mining Equipment ResearchGate

(PDF) Performance Measurement of Mining Equipment ResearchGate

The measurement of mining equipment performance has evolved. Initially, the measurement was done using singlemeasurement indices such as machine availability, production index and utilisations ...

OpenPit Mining | Method and Process | Epiroc

OpenPit Mining | Method and Process | Epiroc

OpenPit Mining | Method and Process Openpit mining Openpit mining provides significant proportions of many of the world's major mineral commodities. In hard rock mining, much of the world's annual output of copper, gold and iron ore is won from openpit operations.

Shortterm planning of a work shift for openpit mines: A case study

Shortterm planning of a work shift for openpit mines: A case study

This work deals with the shortterm planning problem of a work shift for openpit mines. The problem involves ore and waste fronts, shovels, heterogeneous truck fleets, and discharge points. The allocation of trucks is dynamic to allow multiple routes to be assigned to each truck. The problem consists of deciding which fronts must be mined and ...

Transport digging capacity calculation | PPT SlideShare

Transport digging capacity calculation | PPT SlideShare

7. Digging Capacity of Shovel No. Description Value 1. bucket size m3 2. fill factor for well blasted rock = 80% 3. average bucket capacity = x m3 4. swing time second 28 5. passes per minute, continuous operation 60/28 6. cubic metre per hour continuous x 60/28 x 60 787 7. swell factor 67% 8 ...

Estimating Ore Production in Openpit Mines Using Various Machine ...

Estimating Ore Production in Openpit Mines Using Various Machine ...

This study aimed to develop and assess the feasibility of different machine learning algorithms for predicting ore production in openpit mines based on a truckhaulage system with the support of the Internet of Things (IoT). Six machine learning algorithms, namely the random forest (RF), support vector machine (SVM), multilayer perceptron neural networks (MLP neural nets), classification and ...